For the cladding of bridge pylons at a height of 320 meters, the façade panels needed to be both lightweight and strong. Due to the substructure requirements and the challenges of handling at such great heights, each panel's weight was capped at a...
In this project, an old sewer was renovated with carbon concrete, significantly extending its service life. The reinforcement was supplied in rolls in our CARGO system for easy product handling. The roll with a width of 2.3 m had approx. 175...
This reconstruction and strengthening project was carried out in the Sındırgı district of…