For the cladding of bridgepylons at a height of 320 meters, the façade panels needed to be both lightweight and strong. Due to the substructure requirements and the challenges of handling at such great heights, each panel's weight was capped at a...
In this project, an old sewer was renovated with carbon concrete, significantly extending its service life. The reinforcement was supplied in rolls in our CARGO system for easy product handling. The roll with a width of 2.3 m had approx. 175...
Wood-effect concrete facade at the Clinic Gut
With the opening of the Klinik Gut in Fläsch in 2017, an architecturally and…
Bridge over the Kuppritzer Water – Wurschen (Saxony)
With the replacement construction of the bridge over the Kuppritzer Water on the S 111 in Wurschen (Bautzen district,…
How solidian Briksy Reinforced AAC Walls in a Go-Tek Yapı Project
In a recent project with Go-Tek Yapı which we…
Two Carbon Concrete Bridges in Kreuzau
Innovative Infrastructure for Tomorrow – Two Carbon Concrete Bridges in Kreuzau